PV Legal Framework Italy
Who is active in renewable energy business knows, that legal-administrative barriers are among the main obstacles in several European countries impeding a quicker PV technology deployment. Although many countries have already implemented favourable PV support policies, when it comes to constructing PV projects, bureaucracy and highly complex procedures and requirements (i.e. notification, registration, licensing, environmental impact assessment, etc.) hamper installation processes significantly. As a result, the development and the sustainable establishment of solar markets in many European countries is unnecessarily delayed.
This Blog always tries to inform about the latest legal frameworks, national and regional laws in Italy. We would like to introduce the PV LEGAL project, an initiative co-funded by the Intelligent Energy Europe Programme of the European Commission. The overall goal of the PV LEGAL Project is to overcome such legal-administrative barriers during planning and installation processes (including grid connection) of photovoltaic (PV) systems. The project consortium aims at improving the framework conditions for PV in Europe and to allow for faster and more efficient market development in the various countries. In this context the project website offers a free and comprehensive online database, gathering detailed quantitative and qualitative data on project development processes and bureaucratic barriers hampering the set-up of photovoltaic (PV) systems, in 12 EU countries, also in Italy.
![]() |
| Screenshot PV LEGAL |
In Italy, the need for a simplification and harmonization of the legal-administrative framework in the PV sector is widely recognized as a priority. Actions are being taken at different levels.
- The National Guidelines for the Autorizzazione Unica the centralized procedure for the authorization of PV Systems), foreseen by DLgs. 387/2003 and left aside for many years, have been readmitted to the political agenda. The document has been adopted the 8th of July 2010 by the State – Regions Unified Conference and will enter into force after publication in the OJ. Regions will have to adapt their frameworks to comply with the National guidelines within 90 days. The Autorizzazione Unica is one of the main bottlenecks for the PV sector in Italy and the lack of clear procedures defined at National level allowed for the proliferation of regional norms. The Guidelines are a significant step forward towards the simplification and harmonization of the authorization process in Italy.
- A Regulation (now being examined by the Parliament) will simplify the bureaucracy currently necessary to get the landscape authorization. This will imply important simplifications for the installation of PV systems when landscape restrictions are present and Superintendencies are involved. The regulation might sensibly reduce waiting times from more than 100 to 60 days to get the necessary permissions for a number of interventions judged to be of “minor entity”.
- Modifications to the Legislative Decree 152/2006 (environment) have been adopted on June 24, 2010. The decree modifies, among others, the part II of the DLgs 152/2006 concerning the Environmental Impact Assessment (VIA) with the aim of simplifying the procedures and combining the public interest for the preservation of the environment with that of economic development.
- Plans for the development of the transmission grid extension and capacity are ongoing. The development plan (see TERNA –Piano di Sviluppo 2010) addresses the implementation of the development of the necessary grid infrastructures, gives an overview of the status and time for completion of works. Particular attention is given to the infrastructural development of the southern Regions. TERNA is the Italian company operating the Italian high-voltage transmission grid.
- With regard to the low and medium voltage a convention between Enel and the Ministry of Economic Development was signed in February 2010 in order to adapt the distribution grid to the use of electricity produced by PV systems (up to 1 MWp) and develop smart grid solutions in Campania, Puglia, Calabria and Sicily (structural funds).
- Speculation on the grid connection permits and the “reservation” of the grid capacity has proved to be a problem particularly in some Regions, especially in Puglia. The Italian Authority for Electricity and Gas (AEEG) has acknowledged the issue in its “Relazione dell’Autorità per l’Energia Elettrica e il Gas sullo stato di utilizzo ed integrazione degli impianti alimentati da fonti rinnovabili”, (PAS 3/10 of January 29, 2010). AEEG has subsequently issued a consultation document (Documento di consultazione DCO 15/10) to address the problem of speculation by introducing some specific provisions in the regulation governing the procedures, costs and timing for the connection of RES systems to the grid (Unified Text for Active Connections - TICA).
- Some improvements are being introduced in the direction of a better and easier access to the FiT. The Deliberation of the Authority (AEEG) ARG/elt 173/09 gives the GSE (in charge of managing the electricity services) responsibility to introduce on-line procedures in order to simplify the information and document exchange between producers and GSE for the access to the incentives. A new procedure for the formalization and subscription of the contract of the FiT Conto Energia has been introduced as of January 2010.
- AEEG started support activities to grant funding to pilot projects aimed at developing smart grid solutions (Deliberation Arg/elt 39/10 of 25 march 2010).
- Following the indications of another deliberation of the AEEG (ARG-elt 93/09), the GSE has defined aprocedure to improve the predictability of the production from variable and intermittent renewable sources.
Status as of April 2010
The National Guidelines for the Autorizzazione Unica (the one stop shop procedure for the authorization of PV Systems), foreseen by law and left aside for many years, have been readmitted to the political agenda after the issue was raised by Assosolare in the framework of the PV LEGAL project. A draft is now waiting to be discussed by the State – Regions Unified Conference and should be approved in 2010. The Autorizzazione Unica is one of the main bottlenecks for the PV sector in Italy.
A new regulation (now being examined by the Parliament) will simplify the bureaucratic procedure currently necessary to obtain the landscape authorization for PV systems having a “minor impact” on the buildings. The regulation might reduce waiting times from more than 100 days to 60 days in those cases where landscape restrictions are present and Sopraintendenze (Ministerial offices at local level in charge of controlling that the heritage, landscape and architectural qualities of the territory are preserved correctly and responsible for the issuing of permissions) are involved. Also the administrative burden for the offices involved will be significantly reduced.
Some improvements are also being introduced in the direction of a better and easier access to the feed in tariffs. The energy regulatory authority AEEG has given the Gestore dei Servizi Energetici (GSE, institution in charge of managing the energetic services and the feed-in tariffs) responsibility to introduce on-line procedures in order to simplify the information and document exchange between producers and GSE for the access to the incentives. A new procedure has been introduced as of January 2010.
Source: Copyright © PV Legal Consortium - All rights reserved
http://www.pvlegal.eu/results/progresses/italy.html
http://www.pvlegal.eu/results/progresses/italy.html
Labels:
Energy policy,
feed-in tariff,
GSE,
guidelines,
Italia,
Italy,
law,
legal,
normatives,
Photovoltaics,
PV,
Solar
13 Juli 2010
Ministry of Economic Development finally approves new Italian feed-in tariff "Conto Energia" and regional authorization guidelines
Sometimes it is worth waiting and finally a long wait comes to an end: On the 9th of July 2010, the Italian ministry of economic development officially announced the approval of the new PV feed-in tariffs and of regional guidelines for renewable power plants. Starting 2011, the third "Conto Energia" will gradually reduce the tariffs (18% to 20% in three reduction steps for the year 2011 as illustrated below and for 2012 and 2013 another 6% per annum), reducing the impact on the consumer's electric bills. The national guidelines give general rules about the approval procedure for building and operating power plants driven by renewable energies in order to coordinate the sector and grant a similar development in all Italian regions.
Source: Italian ministry of Economic Development, translation and summary: PHOTON (all rights reserved)
Other Sources and where to read more about this topic:
edilportale.com | Articles 1, 2, 3 | Authors: Rossella Calabrese et al. (all rights reserved);APER | http://www.aper.it/newsite/images/stories/cstampa/2010/com_stampa_16-2010_l.g%20e%20c.pdf (all rights reserved).
The complete press release of Italian ministry of Economic Development can be viewed using the following links:
08 Juli 2010
PV incentives in Italy — Italian government to discuss new incentives for solar energy on July 8th
According to a recent press release by Italian Government and photon-international.com on the 8th of July 2010, the central and regional governments in Italy will discuss, among other things, future incentives for solar energy. After the first two incentive programs, named respectively “Conto Energia” and “Nuovo Conto Energia”, the future “Conto Energia” is expected to be designed. As reported before on this Blog there circulated already several drafts for such new PV incentives regime to be expected for the next three years in Italy.
Sources: Presidenza del Consiglio dei Ministri, Translation and summary: PHOTON (all rights reserved)
The complete press release can be viewed in PHOTON's archive using the following link:
Labels:
conto energia,
feed-in tariff,
Italia,
Italy,
Photovolatik,
Photovoltaics,
PV,
Solar
15 Mai 2010
Simplified DIA Authorization Procedure sufficient for Renewable Energy Projects in Italy up to 1 MW
This Blog recently reported about Italian Constitutional Court’s decisions no. 119/10 and no. 124/10, declaring illegitimate the regional laws of Apulia and Calabria respectively (see previous Blog-Post on 10 April 2010). Main reason for such lawsuit and Constitutional Court’s decisions was, that both regional laws had unilaterally allowed for the authorisation of 1 MW or 500 KW projects by means of a simple “start of works” declaration (dichiarazione di inizio attività or in short “DIA”), contradicting federal law (Decreto Legislativo or Dlgs) no. 387/2003, which foresees and requires a lengthy autorizzazione unica procedure (in short “AU”) for much smaller projects (e.g. photovoltaic projects above 20 KW or wind energy projects above 60 KW).
Now, only a few weeks after and maybe as a reaction to the aforementioned Constitutional Court’s verdicts, which not only have caused significant uncertainty in the market as to the validity and risks of previously authorized DIA renewable energy projects (mainly solar pv plants) in Apulia and Calabria, but also were widely perceived by investors and renewable energy industry as a political obstacle to the expedited development and financing of renewable energy plants in Italy, it comes to a sudden and unexpected turn of events. Italian Government decided to enact a new national law in compliance to European Community Law and EU guidelines.
The Italian Chamber of Deputies has taken the above mentioned market concerns seriously and reacted accordingly by proposing on a federal level what the Apulia and Calabria regions had in the past attempted to achieve independently without the necessary federal backing. Indeed, on 23 April 2010 the Chamber of Deputies proposed an amendment to the latest draft of Italy’s so-called “Community Law 2009” (ddl Comunitaria 2009), the yearly framework law delegating the Government to enact by decree the rules necessary to comply with the mandatory provisions of European Community Law. In particular, the Chamber of Deputies proposed that, when implementing Directive 2009/28/EC on the promotion of renewable energy sources, the Government should provide that renewable energy projects with a peak capacity of up to 1 MW be authorised through a simplified “DIA”.
On 12 May 2010 the proposed amendment was approved by the Italian Senate (Art. 17 ddl n. 1781-B), which now means that it now will soon become law and therefore the Italian Government must enact the necessary provisions by legislative decree within the same deadline as for transposing the entire Directive 2009/28/EC into national law, i.e. 5 December 2010. In such new law (Dlgs) renewable energy projects of up to 1 MW will be subject to the simplified DIA procedure.
Latest developments and recent Italian Government reactions can be interpreted as a clear sign, that Italy is willed to finally end legal uncertainty and discussions due to regional normative chaos and to create a stable legal foundation on a national level in order to further promote renewable energy investments. Simplifying authorization procedures is definitely one first good step to reestablish market stability and investor's trust and to prepare the stage for future growth in Italy. Next decisive step should be the overdue regulation of the new incentive regime (Conto Energia) for the next three year period 2011-2013, expected to be officially announced within 30 June 2010 by GSE under the auspices of Italian Government (Ministry of Economic Development, Ministry of Economy and Finance, Ministry of Environment).
Sources and where to read more about this topic:
McDermott Will & Emery | Author: Carsten Steinhauer (all rights reserved);
projectfinancemagazine.com (all rights reserved).
Photo via picApp | Photo by Andreas Rentz/Getty Images
Content © 2010 Getty Images | All rights reserved.
Labels:
DIA,
Italia,
Italy,
law,
normatives,
Photovolatik,
Photovoltaics,
PV,
Renewable Energy,
Solar
10 April 2010
Italian Institutional court claims Apulia Regional Law n. 31/2008 — DIA Authorization of PV Projects up to 1MW declared as unconstitutional
Maybe it was the ease of developing renewable energy projects due to administrative and bureaucratic simplifications in Apulia under the provisions of Apulia Regional Law 31/2008 introduced by green energy friendly Nichi Vendola, president of Apulia region, that has been a big thorn in the sides of many other regions.
However on 29 December 2008, the Italian Government filed a lawsuit at the Constitutional Court for the declaration of unconstitutionality of Apulia Regional Law 31/2008. A first public hearing on this matter took place on 26 January 2010 and resulted now in a final verdict published on 31 March 2010. The Constitutional Court specified the illegitimacy of two paragraphs of Art. 3 (Paragraphs §1 and §2) of Apulia Regional Law 31/2008, pursuant to which renewable energy plants with an output of up to 1MW could so far be authorised through a simplified “start-of works” declaration (DIA – Dichiarazione inizio attività).
However on 29 December 2008, the Italian Government filed a lawsuit at the Constitutional Court for the declaration of unconstitutionality of Apulia Regional Law 31/2008. A first public hearing on this matter took place on 26 January 2010 and resulted now in a final verdict published on 31 March 2010. The Constitutional Court specified the illegitimacy of two paragraphs of Art. 3 (Paragraphs §1 and §2) of Apulia Regional Law 31/2008, pursuant to which renewable energy plants with an output of up to 1MW could so far be authorised through a simplified “start-of works” declaration (DIA – Dichiarazione inizio attività).
Hence the court decision now implies with immediate effect, that ground-mounted PV projects above 20kW located in the Puglia region can no longer be authorized by a simple DIA procedure, but require an Autorizzazione Unica (AU – conferenza unificata), like originally foreseen in national decreto legislativo n. 387 (Attuazione della direttiva 2001/77/CE relativa alla promozione dell’energia elettrica prodotta da fonti energetiche rinnovabili nel mercato interno dell’elettricità) issued on 29 December 2003. More importantly on the other hand the court decision can not retroactively affect PV projects which had been fully permitted through the DIA procedure before the verdict. Already permitted projects should therefore remain valid and unaffected. Only in case these authorizations would be legally challenged within the legal period for objection, then the Constitutional Court’s decision could have sort of a retroactive effect.
In any case, Apulia government will now have to react properly and will have to introduce a new regional law in order to strike a fair balance between the interests of all parties involved. The legitimate reliance of the developer on the validity of the regional laws as they were in force during the authorisation process will have an important impact, as well as the investments already made in the project. However the current ruling only applies to the authorizations approved under the regional law n. 31/2008 and hence has no direct impact on the previous Regional Law n. 1/2008 whose article 27 already allowed for the authorization of 1MW PV projects by means of a simple DIA.
In any case, Apulia government will now have to react properly and will have to introduce a new regional law in order to strike a fair balance between the interests of all parties involved. The legitimate reliance of the developer on the validity of the regional laws as they were in force during the authorisation process will have an important impact, as well as the investments already made in the project. However the current ruling only applies to the authorizations approved under the regional law n. 31/2008 and hence has no direct impact on the previous Regional Law n. 1/2008 whose article 27 already allowed for the authorization of 1MW PV projects by means of a simple DIA.
Labels:
Apulia,
Italia,
Italy,
law,
legal,
news,
normatives,
Photovolatik,
Photovoltaics,
Puglia,
PV,
Renewable Energy,
Solar
23 November 2009
Conto energia 2011+
As is known, Italian PV market currently suffers market uncertainty, because it is still not clear what exactly the new tariffs incentive after 2010 will be. Even though the Ministerial Decree of 19 February 2007 which established the Nuovo Conto Energia Bill has announced several times to provide a tariff revision 2011, down to the present day there was no new ministerial decree or binding decision by Italian government.
The three Italian PV associations GIFI ANIE, APER and ASSOSOLARE, decided to take action and have developed a common understanding and shared inherent in the revision of the Energy Bill 2011. Their proposal was sent to the Ministry of Economic Development and the Ministry of Environment.
The proposal includes:
Sources: pienosole.it, GIFI ANIE, APER, ASSOSOLARE.
The three Italian PV associations GIFI ANIE, APER and ASSOSOLARE, decided to take action and have developed a common understanding and shared inherent in the revision of the Energy Bill 2011. Their proposal was sent to the Ministry of Economic Development and the Ministry of Environment.
The proposal includes:
- New feed-in tariff shall be valid for five years (2011-2015) and the total power to reached through new incentives in this five-year period shall be raised from 1.200 to 8.000 MWp;
- New feed-in tariff shall only have a decrease of 4% per year, starting from July 2012, after the incentive came into force in 2011, with the aim of underpinning the market towards the "grid parity";
- Reformulation of the subdivision for power classes into new groupings: 1-6 kW, 6-20 kW, 20-200 kW 200-1.000 kW and over 1.000 kW;
- Adoption of only two types of installation and simpler: "on earth" and "on building"; and
- Special provision of special bonuses:
- for total architectural integration of photovoltaics (+15%);
- for installation in areas affected by environmental as quarries and landfill at the end of life cycle (+10%); as well as
- for the replacement of asbestos roofing and Eternit (+10%).
Classi di Potenza kWp | Impianti a Terra €/kWh (vs. 2010) | Impianti su Edificio €/kWh |
| 1-6 | 0,365 (-5%) | 0,401 (-5%) |
| 6-20 | 0,339 (-7%) | 0,375 (-7%) |
| 20-200 | 0,313 (-9%) | 0,330 (-14%) |
| 200-1.000 | 0,304 (-12%) | 0,323 (-16%) |
| > 1.000 | 0,297 (-14%) | 0,315 (-18%) |
Labels:
2011,
conto energia,
feed-in tariff,
Italia,
Italy,
PV,
Solar
19 November 2009
The mother of all questions
<<When exactly in 2010 will Italy
reach the 1.200.000 kWp?>>
Labels:
conto energia,
feed-in tariff,
GSE,
Italia,
Italy
01 November 2009
Technological trends (BIPV) from SAIEnergia 09
Italy slowly discovers Building-Integrated Photovoltaics (BIPV), building integration of PV solar power systems, and thus Photovoltaic modules that are integrated directly into a roof's surface to provide more aesthetic appeal.
Here are the best italian solutions and products for perfect integration of solar power systems into the roof of a building seen at SAIEnergia 09 in Bologna:
Tegolasolare: Traditional hand-crafted clay roof ceramic tile with a small, modular, discreet photovoltaic panel (4 cells) integrated and fitted on the front (see picture above).
Tech-tile: Techtile System can generate both electricity (Techtile Energy) or heat (Techtile Therm). It permits maximum integration with the building because the Techtile roof tile looks exactly the same as a conventional tile.
System Photonics: The ROOF collection replaces or becomes a part of traditional roof coverings (shingle roofing or cascade tiling), while maintaining and improving their insulation and protective properties.
Read more about this topic at:
pienosole.it;
design.tv.it;
solarserver.de.
Here are the best italian solutions and products for perfect integration of solar power systems into the roof of a building seen at SAIEnergia 09 in Bologna:
Tegolasolare: Traditional hand-crafted clay roof ceramic tile with a small, modular, discreet photovoltaic panel (4 cells) integrated and fitted on the front (see picture above).
Tech-tile: Techtile System can generate both electricity (Techtile Energy) or heat (Techtile Therm). It permits maximum integration with the building because the Techtile roof tile looks exactly the same as a conventional tile.
System Photonics: The ROOF collection replaces or becomes a part of traditional roof coverings (shingle roofing or cascade tiling), while maintaining and improving their insulation and protective properties.
Read more about this topic at:
pienosole.it;
design.tv.it;
solarserver.de.
Labels:
BIPV,
cool,
integrated solar,
Italia,
Italy,
Photovolatik,
Photovoltaics,
Renewable Energy,
roof,
Solar,
Technology,
Trends
31 August 2009
Americans invade Apulia
Texas-based JMJ Holdings is close to purchase the AS Bari football club from the Matarrese family. JMJ president and CEO Tim Barton has already signed an exclusive agreement to buy the team pending due diligence over the next 30 days.
The takeover of AS Bari marks only the beginning of JMJ's italian venture. Barton said he first heard the team was for sale when he was in southern Italy on a business trip to develop environmentally friendly energy investments a few months ago.
JMJ Holdings, founded in 1990 by CEO Tim Barton, is a real estate firm engaged in the acquisition, development, management and advisement of luxury real estate assets on a global basis. Since renewable energy offers high returns, like many other international real estate firms and investment funds, JMJ is on the search for green energy projects and investment opportunities.
Barton mainly focuses on photovoltaics in Apulia. He sees "photovoltaic installations on every rooftop in the city of Bari."
Conclusion: International financial crisis has not only slown down project developments in Italy but also brought harsh market conditions to solar industry. Thus we definitely need more courageous entrepreneurs like Barton, equipped with visions and the necessary capital.
Labels:
Apulia,
Italia,
Italy,
news,
Photovolatik,
Photovoltaics,
Puglia,
PV,
Solar
29 Juli 2009
Autostrada del Sole – Multifunctional Carports and house top solar PV installations on petrol and service stations
Good ideas are only those that are implemented and finally turn into reality. I am sure many visionaries had similar ideas along those lines, but sometimes even sleeping giants seem to wake and pick up those ideas, concepts and start sustainable initiatives.
Autostrade per l'Italia Spa plans to invest, install and operate a network of many small size PV integrated carports and house top solar PV installations on petrol and service stations. Along the 2854 Km of motorway managed by Autostrade per l'Italia Spa, there are round about 3000 parking sites, gas stations, roadhouses and service areas with parking possibilities. According to "pienosole.it" the sum of all small solar PV installations could equal a cumulative global PV installations capacity of approximately 5,5 GWh/year and could supply all motorway facilities with clean solar energy.
Conclusion:
"Every little helps" since many small size solar PV installations in the end form one large-scale power plant and sometimes great ideas can only be implemented by great corporations right at the source.
Labels:
carport,
Innovation,
Italia,
Italy,
Photovolatik,
Photovoltaics,
PV
03 Dezember 2007
Abonnieren
Posts (Atom)